Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Trading house Yuzhny"
how we implemented this floor design
FEATURES OF THE WORKS
On the first day of pouring, everything was already ready: our team went to the facility, the pump arrived, the track was assembled, it only remained to wait for a car with concrete, but...the electricity was suddenly cut off at the concrete junction. Because of this, the filling was canceled that day, and only 3 days later, on the second attempt, it was possible to start full-fledged work.
In St. Petersburg, at the time of the work, the heat was under 30 degrees. At this temperature, it was necessary to work very well and very quickly, since the concrete was quickly becoming. But we have no experience in such matters, so by the evening we completed the grout.
There was another point with the fact that during the work we slightly soiled the wall and the territory in front of the gate. It was settled simply – they sent people to the facility in two approaches and cleaned everything.
OUR RESULTS
The client liked the result of the work. Literally, the review sounds like this: "I saw the floor, I just sooo "went in"-I liked it, so 5 points."