Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR IN THE PARKING LOT IN THE TAGANSKY DISTRICT

WE HAVE SAVED FOR THE CLIENT 1 297 500

FLOOR ENGINEERING CONSTRUCTION Topping floor for parking in the Tagansky district of Moscow

Moscow, 1st Dubrovskaya str., 1, room 4
Characteristics and description
Company name
LLC "STATUS"
The purpose of the floor and the room itself
Topping floor for parking in the Tagansky district of Moscow
Type of floor
topping floors
Thickness of the concrete layer
130 cm
Room area
1960 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The client's need was to change the old parking surface to a new one and level the floor. The object was located on the ground floor of a residential building and was a parking lot of some ministry. The task was to align the coating so that there was a slope in the middle. This was required so that the water or dirt that flows from the machines would drain into the trays. We proposed and subsequently implemented a technical solution in the form of a concrete floor with a hardener and macrofibre.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 6 487 500 ₽
Topping floor for parking in the Tagansky district of Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "STATUS"

how we implemented this floor design

FEATURES OF THE WORKS

Difficulties during the work were mainly with residents, because the object was located in a residential building. This manifested itself at the preparation stage, when the punchers were working and the tray was being installed. But that's half the trouble. The "most-most" happened at the grout stage, because the workers did it at night – immediately after the concrete was ready. Through communication skills, we have settled all the grievances.

According to the results of the filling, two corrections were made – firstly, a part of the flooded coating was demolished and it was filled in again so that the cars could comfortably pass along the height. Secondly, an additional tray was installed.

OUR RESULTS

We were constantly in communication with the client and promptly responded to his comments (and sometimes even comments). As a result, we provided a ready-made coating corresponding to his original request.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
8.jpg
9.jpg
10.jpg
11.jpg
12.jpg
13.jpg
14.jpg
15.jpg
16.jpg
17.jpg
18.jpg
19.jpg
20.jpg
21.jpg
22.jpg
23.jpg
24.jpg

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "STATUS"

SEE THE RESULT OF OUR WORK
result-status.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton