Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH TOPPING FOR A BUILDING IN RAMENSKOYE

WE HAVE SAVED FOR THE CLIENT 259 000
20%Economy
Topping floor for production in the village of Kratovo

FLOOR ENGINEERING CONSTRUCTION Topping floor for production in the village of Kratovo

MO, Ramenskiy district, Kratovo village, Karl Marx str., 21A
Characteristics and description
Company name
Private person
The purpose of the floor and the room itself
Topping floor for production in the village of Kratovo
Type of floor
topping floors
Thickness of the concrete layer
200 cm
Room area
1048 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE IDENTIFIED AND IMPLEMENTED THE OPTIMAL ENGINEERING SOLUTION

According to the customer's idea, the building was to eventually become a production one. He was knitting a reinforcing mesh on his own – our duties included pouring an industrially polished concrete floor with a hardener on two floors: first on the second, and after a while on the first. It was required to pour through a concrete pump.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 5
Total cost
Budget within the framework of: 1 295 000 ₽
Topping floor for production in the village of Kratovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Private person

how we implemented this floor design

DIFFICULTIES DURING WORK

The difficulty appeared during the first pouring – not a very good foundation in terms of a small number of beams and lintels. They put up racks to support the second floor. Careful work on the filling and additional supports did their job, and we successfully completed the filling.

The second difficulty is that there were residential buildings near the object. In order not to create noise and interference with the work of helicopters, residents had to start pouring early – at 4-5 o'clock in the morning. It is important for us to maintain good relations with the environment in which we work.

OUR RESULTS

The customer was satisfied with the result of the filling work on the first and second floors. We completed all the stages on time and in full compliance with the engineering solution and technical program.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The filling began on the second floor
2.jpg
Surface treatment with grout machines
3.jpg
The beginning of the filling on the first floor
4.jpg
The filling continues
5.jpg
Concrete pouring is completed
6.jpg
The stage of processing with special equipment
7.jpg
Surface treatment with grout machines
8.jpg
Application of moisture-retaining impregnation

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Private person

SEE THE RESULT OF OUR WORK
result-polevaya.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton