WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
To begin with, we note the efficiency of the customer himself at the negotiation stage. A few days after meeting our company, he made the payment.
The client's company had a production facility that he rented. It was necessary to fill only half of the room – to make a full fill along the length, but to leave a meter of distance untouched along the width on the right side. This was due to the fact that the doors were located on the wall below, and when filling the entire area, they would have to be lifted. But the customer was not going to use the doors in the future.
We have proposed a technical solution – a concrete floor with a hardener reinforced with macrofibre.
The following aspects are important to the customer: