Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR FOR THE WORKSHOP IN VIDNOE

WE HAVE SAVED FOR THE CLIENT 458 800
20%Economy
Topping floor for the workshop in Vidnoye

FLOOR ENGINEERING CONSTRUCTION Topping floor for the workshop in Vidnoye

25 Belokamennoe Highway, Vidnoye, Moscow Region
Characteristics and description
Company name
LLC "SpetsMetallMaster Group of Companies"
The purpose of the floor and the room itself
Topping floor for the workshop in Vidnoye
Type of floor
topping floors
Thickness of the concrete layer
12 cm
Room area
470.7 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

This time, a company from the metallurgical industry approached us – there was a need to tidy up the floor in a room on the second floor.

After conducting a standard detailed technical survey over the phone and visiting the site before signing the contract, our design department received all the necessary information and selected the best technical solution.

The following design was approved and subsequently implemented: a reinforced concrete floor with an average thickness of 12 cm and a combined reinforcement of metal frame and plastic fiber.

Terms of work
Number of days for all work: 26
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 294 000 ₽
Topping floor for the workshop in Vidnoye: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "SpetsMetallMaster Group of Companies"

how we implemented this floor design

FEATURES OF WORKS

The customer carried out some of the preparatory work, such as dismantling the ramps, on their own.

The facility was a restricted area, so in order to visit it, it was necessary to coordinate and approve lists of people and vehicles.

From the metal supplier, we ordered already connected grids of ⌀10 mm reinforcement bars. The finished products, measuring 2 by 6 meters, were laid out in the room and fastened together.

There was a large opening between the first and second floors, which made it convenient to supply concrete. There was also a crane beam, which was used to lift equipment and materials.

OUR RESULTS

The client wanted a smooth, wear-resistant, impact-resistant, and durable industrial floor. And we delivered. We think that a quality floor will have a positive impact on the production volumes of the customer's company.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The ramp corner has been installed
2.jpg
There are only a few areas left without reinforcement
3.jpg
The film has been laid
4.jpg
Everything is ready for pouring
5.jpg
The concrete pump is moving in
6.jpg
The track has been installed
7.jpg
The concrete is being poured
8.jpg
The concrete mixture is being compacted
9.jpg
The pouring has been complete
10.jpg
After troweling, the varnish has been applied
11.jpg
The joints are being cut
12.jpg
Checking the depth of shrinkage joints
13.jpg
The seams are ready
14.jpg
Checking the flatness of the floor

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "SpetsMetallMaster Group of Companies"

SEE THE RESULT OF OUR WORK
result-gk-smm-vidnoe.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton