A client who had us do a floor in a warehouse in 2023 came back to us for work on another room at the same address. Our standard phone interview and site visit provided the design department with all the information they needed.
A technical solution was developed: a 13 cm thick topping floor reinforced with plastic fiber and additionally reinforced with a 10 mm diameter frame in several places.
The scope of work also included the construction of two ramps with the preliminary demolition of the corresponding sections.