Characteristics and description
Company name
The owner of the cottage
The purpose of the floor and the room itself
Topping floor in the cottage, Istra
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
580 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE NEEDS OF THE CLIENT

This object was located in the Millennium Park cottage village. The client planned to finish the installation of the floor for the cottage before the summer and turned to our company in the winter. The task was to pour a concrete screed with a minimum thickness of 50 mm in the presence of pipelines for underfloor heating and under the "polished concrete" technology. The client needed an affordable way to make the floor beautiful, durable and easy to operate.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 7
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 790 500 ₽
Topping floor in the cottage, Istra: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: The owner of the cottage

how we implemented this floor design

FOUND AN ECONOMICAL SOLUTION TO THE FLOOR ARRANGEMENT FOR THE COTTAGE

After the request, the next day, our specialist examined and measured the room, collected the necessary information from the client and sent the data to the technical department of our company. Based on the data obtained, it was decided to offer the customer an affordable, but not inferior in quality technology using polypropylene fiber.

ADVANTAGES OF FIBER-REINFORCED CONCRETE TECHNOLOGY

Fibro-concrete floor technology, unlike reinforced with reinforcement, has a number of advantages. A single armature works only for the bottom or only for the top, and a double one will be a good blow to the wallet. Fiber works all over the base and in some respects surpasses the reinforcing mesh, namely:

  • Increases the strength of concrete for bending, compression and splitting up to 35%.
  • Increases impact and fatigue strength over 500%.
  • Prevents delamination of concrete mix up to 25%.
  • Reduces the time of primary and final hardening by up to 50%.
  • Reduces the risk of chipping corners and edges up to 90%.

HOW WE CUT COSTS

The technology we have proposed has reduced the cost by 42%, because fiber is cheaper than rebar. It greatly reduces the time of work, because there is no need to reinforce with a reinforcing mesh. At the same time, concrete is already supplied with fiber.

FLOOR ARRANGEMENT FOR A COTTAGE IN MILLENNIUM PARK

The work was carried out in winter at -15° below zero, this affected the hardening of the concrete mixture, we had to wait 40% longer than usual. In connection with the construction of the room, the concrete mix was supplied using a concrete pump, and for feeding into the basement, we constructed a complex route of concrete guides.

Additional difficulties at the facility were small rooms with an area of up to 4 m2, we coped with this manually and with the help of a single-rotor grout machine, or in the common people, a "kromochnik".

THE RESULT OF OUR WORK

Despite all the difficulties, thanks to the professionalism of our team, the work was completed on time. The result: a high-quality concrete floor that will last at least 20 years.

The client received a smooth concrete surface and wrote a review as a thank you.

The stages of the floor arrangement and the final result are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Installation of the route of concrete guides
2.jpg
Concrete supply to the concrete pump
3.jpg
Sealing of polypropylene fiber
4.jpg
Acceptance of concrete
5.jpg
Screed of concrete mix by liquid lighthouses
6.jpg
Completion of works on acceptance of concrete of the first room
7.jpg
Completion of concrete acceptance works in the basement
8.jpg
Acceptance of concrete on the ground floor
9.jpg
Completion of work on the filling of the first floor
10.jpg
Grout of the hardener on the ground floor

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY The owner of the cottage

SEE THE RESULT OF OUR WORK
result-millenium.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton