WE HAVE DETERMINED THE OPTIMAL ENGINEERING SOLUTION
The room was being prepared for a workshop for the production of vaccines, medicines, ampoules, etc. A base was required for a large machine that the client bought. A very flat floor was needed, and he prepared and leveled it himself. Pouring was expected from us. As a technical solution, a topping floor with metal fiber was chosen and implemented.
The following aspects are important to the customer: