Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR OF THREE DIFFERENT INDUSTRIAL BUILDING PROJECTS IN SHCHELKOVO

WE HAVE SAVED FOR THE CLIENT 506 100
20%Economy
Concrete floor in the workshop for foundations, ramps and mezzanines in Shchelkovo

FLOOR ENGINEERING CONSTRUCTION Concrete floor in the workshop for foundations, ramps and mezzanines in Shchelkovo

MO, Shchelkovo, Sokolovskaya industrial zone
Characteristics and description
Company name
Gamma Color Rus LLC
The purpose of the floor and the room itself
Concrete floor in the workshop for foundations, ramps and mezzanines in Shchelkovo
Type of floor
topping floors
Thickness of the concrete layer
28 cm
Room area
422 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We have already made a concrete floor with a reinforcing top layer inside the production room for this client. Within the framework of the same agreement, three additional agreements were concluded for work on the installation of floors: 1) on 3 foundations, 2) on 6 ramps and 3) on 2 mezzanines.

The following designs were selected:

  • for foundations – a concrete floor with a thickness of 28 cm, reinforced with reinforcement with a diameter of 12 mm in two layers;
  • for ramps – a concrete floor with an average thickness of 20 cm with topping, reinforced with a combined reinforcement with a diameter of 12 mm in one layer and polypropylene macrofibre;
  • for mezzanines, a concrete floor with a 12 cm thick topping and reinforcement in two layers of reinforcement with a diameter of 10 mm and a mesh with a diameter of 6 mm.
Terms of work
Number of days for all work: 17
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 530 400 ₽
Concrete floor in the workshop for foundations, ramps and mezzanines in Shchelkovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Gamma Color Rus LLC

how we implemented this floor design

FEATURES OF THE WORK

According to the project, the reinforcement of the mezzanines should have been different. But knowing in practice the negative consequences of such an option, we nevertheless insisted on another, more effective solution.

Racks were rented to work with andresols. They were installed to ensure safety during pouring. A huge load was created at the place where the concrete mixture was poured, since the weight of each cube of concrete was about 2.7 tons. Also, these racks remained after pouring for several days for the period of proper solidification of the concrete.

The only point in the entire production cycle that the customer asked to settle was the concrete that got on the wall in several places. We solved this issue quickly – we arrived and cleared it.

OUR RESULTS

As a result of the entire complex of works, the customer now has very strong foundations for equipment, reliable ramps for entry/exit of equipment and durable mezzanines for performing production tasks.

During the period of work on the main agreement, the client and I reached a good understanding, so that during the arrangement of the floors according to additional agreements, we better took into account his wishes and requirements, and he, for his part, helped in every possible way.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Materials were delivered to the facility
2.jpg
The ramps have been prepared for filling
3.jpg
The filling of the ramps has been completed
4.jpg
Flooded pit
5.jpg
All ramps and pits are worn down
6.jpg
Preparation for pouring foundations
7.jpg
Reinforcement is connected and laid for the foundations
8.jpg
Pouring foundations
9.jpg
The fittings for the mezzanine are partially connected
10.jpg
The preparation of the first mezzanine for filling is being completed
11.jpg
Building a track
12.jpg
We accept concrete on the first mezzanine
13.jpg
We finished the grout on the first mezzanine
14.jpg
We are about to start filling the second mezzanine
15.jpg
The filling of the second mezzanine has been completed
16.jpg
Unloading the racks

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Gamma Color Rus LLC

SEE THE RESULT OF OUR WORK
result-schelkovo-antresol-fundament-pandus.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton