WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The object consisted of one large corridor and two more rooms. The customer initially approached us with the idea of his design, according to which the floor will have one layer of mesh. Since the concrete base had already taken place, he proposed to make a coating with a single layer of mesh. We offered our own option – the option of reinforcement not with mesh, but with fiber. And in the course of negotiations, we agreed on this option and approved a technical solution in the form of a concrete floor with a hardener reinforced with polypropylene fiber.
Of the additional works, the dismantling of the old foundation in three places, the manufacture of a pit in one of the rooms and a ramp near the gate were agreed.
The following aspects are important to the customer: