Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR METAL STAMPING WORKSHOP IN KHIMKI

WE HAVE SAVED FOR THE CLIENT 274 800
20%Economy
Concrete floor with a hardener for metal stamping workshop in Khimki

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardener for metal stamping workshop in Khimki

Moscow region, Khimki, mkrn. Skhodnya, Sadovaya str., 7
Characteristics and description
Company name
Energomontazh International JSC
The purpose of the floor and the room itself
Concrete floor with a hardener for metal stamping workshop in Khimki
Type of floor
topping floors
Thickness of the concrete layer
10 cm
Room area
440.75 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

In the metalworking shop, it was necessary to make floors. The customer announced the following requirements for the final result: resistance to dust, abrasion, moisture; impact resistance, durability, evenness. In addition to the floors, it was also necessary to make a ramp on the street and eliminate gaps between the walls and the foundation.

The following technical solution was selected and implemented – a concrete floor with topping and reinforcement with plastic fiber; a street ramp device.

Terms of work
Number of days for all work: 6
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 374 400 ₽
Concrete floor with a hardener for metal stamping workshop in Khimki: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Energomontazh International JSC

how we implemented this floor design

FEATURES OF THE WORK

As mentioned above, we had to eliminate the gaps between the sandwich walls and the foundation at the facility before the standard stages of work. To do this, they used styrofoam and foamed it.

The client planned to divide the facility into two parts, where one would be an office area and the other a production area. The base turned out to be lower in the office area, and when signing the contract, we decided that the floors there would also be lower, and a smooth slope would be made to compensate for the different levels.

However, already in the course of production, we offered the customer to make one level everywhere, providing information on the additional consumption of concrete. He gave the go-ahead, we signed an additional agreement for this volume and eventually filled it everywhere to the same height.

OUR RESULTS

For many types of industrial facilities, a concrete floor with a hardener is the best design option. This room is a great example. Such a floor will perform well both in the office area and in the production area.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Installation of the corner along the boundary of the pit
2.jpg
Topping at the facility
3.jpg
Concrete pump in place
4.jpg
We are sticking self-adhesive film on the walls and columns
5.jpg
Adding fiber to concrete
6.jpg
Filling the ramp
7.jpg
Leveling the concrete level using a laser level
8.jpg
The filling has been completed
9.jpg
After finishing the grout, the varnish has been applied
10.jpg
The seams are cut
11.jpg
Checking the seam depth
12.jpg
Sealing of seams is completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Energomontazh International JSC

SEE THE RESULT OF OUR WORK
result-emi-khimki-shodnya.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton