Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR FOR A WAREHOUSE IN THE SOUTH-EAST OF MOSCOW

WE HAVE SAVED FOR THE CLIENT 168 400

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping for a warehouse in the south-east of Moscow

Moscow, sh. Fraser, 17A, p. 2
Characteristics and description
Company name
NVN LLC
The purpose of the floor and the room itself
Concrete floor with topping for a warehouse in the south-east of Moscow
Type of floor
topping floors
Thickness of the concrete layer
110 cm
Room area
217 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The entire room of this object was about 1,000 m2, but the task was to fill only the part that our customer rented. Accordingly, there was another tenant in this room. The area of our client is 217 m2.

At the stage of agreement of the contract, the customer offered, on his own initiative, to put a corner along the entire perimeter of the flooded area in order to then attach to it with a grid. Thus, he wanted to separate this entire zone from other sites. But we reported that the corner is not required – it is possible to attach a grid and so. As a result, the corner was removed from the final technical solution – the price of the work fell slightly due to this.

Our standard solution was chosen and implemented at this facility – a concrete floor with topping.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 12
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 841 800 ₽
Concrete floor with topping for a warehouse in the south-east of Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: NVN LLC

how we implemented this floor design

FEATURES OF THE WORKS

Since there was another tenant on the territory of the entire premises who had commodity values, we had to coordinate the working hours in advance so that a representative from his side would be present at that time. The technology of laying the floor implies round-the-clock work at a certain stage, so the person from the second tenant was also forced to go out at night.

We filled the floor only on a part of the entire area of the room, and it was necessary to make a ramp, since it towered over the rest of the squares. Due to the peculiarities of the work of the stacker, we made a ramp turned in two directions. For its implementation, it was necessary to dismantle about 10-15 m2 of concrete base. The volume turned out to be large – they expected that everything would fit into one container, and as a result, they called the second one.

Interaction with the customer was remembered only by positive moments. They provided the data we needed in a timely manner: for example, the layout of the racks so that we could accurately calculate the size of the ramp. Also, one day our workers were even fed for free in the local canteen.

OUR RESULTS

After we completed the work, the customer wrote a good review in which he rated our work by 5 points.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Dismantling of the base
2.jpg
Dismantling stage
3.jpg
Dismantling under the ramp has been carried out
4.jpg
The old removed base is put away in a container
5.jpg
Preparation of the foundation
6.jpg
Concrete supply
7.jpg
Reception of concrete mix
8.jpg
Leveling of concrete mix

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY NVN LLC

SEE THE RESULT OF OUR WORK
result-nvn.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton