CONCRETE FLOOR WITH TOPPING FOR A WAREHOUSE IN THE SOKOLINAYA GORA DISTRICT

WE HAVE SAVED FOR THE CLIENT 174 700
20%Economy
Concrete floor with topping in a warehouse in the Sokolinaya Gora district of Moscow

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping in a warehouse in the Sokolinaya Gora district of Moscow

Moscow, 29 Ibragimova Street, building 31A
Characteristics and description
Company name
Individual entrepreneur
The purpose of the floor and the room itself
Concrete floor with topping in a warehouse in the Sokolinaya Gora district of Moscow
Type of floor
topping floors
Thickness of the concrete layer
10 cm
Room area
240 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

In this case, the object was a warehouse on the third floor in the Eastern Administrative District of Moscow. The customer announced the task as follows – to make the floor level to the horizon and at the same time without dismantling the plate.

The chief designer approved such a technical solution – a topping floor with an average thickness of 100 mm and reinforcement with plastic fiber.

Terms of work
Number of days for all work: 5
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 873 600 ₽
Concrete floor with topping in a warehouse in the Sokolinaya Gora district of Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Individual entrepreneur

how we implemented this floor design

FEATURES OF THE WORK

Even before the start of work, our specialist came to the warehouse and did a standard technical inspection. After that, the customer sheathed the walls with drywall, which led to a slight reduction in the area.

Since the facility was of a closed type, it was necessary to coordinate passes for cars and workers in advance.

Initially, we planned and were set to fill on Saturday, but the factory called and reported that they were unable to ensure delivery. I had to find another concrete unit very quickly and cooperate with it at the pouring stage.

The filling was organized as follows: the boom of the concrete pump entered through the window of the room where work was not required; this stage ended there, and from there the workers were lowered using a pre-ordered car tower.

OUR RESULTS

Both we and the client were satisfied with the final product. By the way, this is our third completed concrete floor with topping near the Semyonovskaya metro station.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We started laying the film
2.jpg
The preparatory stage has been completed
3.jpg
The filling has started
4.jpg
Completed the filling
5.jpg
Finished the grout
6.jpg
Applying the varnish
7.jpg
Cut seams
8.jpg
Sealing of seams has been performed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Individual entrepreneur

SEE THE RESULT OF OUR WORK
result-ip-shipunova-moskva.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton