Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Individual entrepreneur
how we implemented this floor design
FEATURES OF THE WORK
Even before the start of work, our specialist came to the warehouse and did a standard technical inspection. After that, the customer sheathed the walls with drywall, which led to a slight reduction in the area.
Since the facility was of a closed type, it was necessary to coordinate passes for cars and workers in advance.
Initially, we planned and were set to fill on Saturday, but the factory called and reported that they were unable to ensure delivery. I had to find another concrete unit very quickly and cooperate with it at the pouring stage.
The filling was organized as follows: the boom of the concrete pump entered through the window of the room where work was not required; this stage ended there, and from there the workers were lowered using a pre-ordered car tower.
OUR RESULTS
Both we and the client were satisfied with the final product. By the way, this is our third completed concrete floor with topping near the Semyonovskaya metro station.