Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR IN A WAREHOUSE IN PODOLSK

WE HAVE SAVED FOR THE CLIENT 346 300
20%Economy
Concrete topping floor for warehouse in Podolsk

FLOOR ENGINEERING CONSTRUCTION Concrete topping floor for warehouse in Podolsk

MO, Podolsk, Bronnitskaya str., 13A
Characteristics and description
Company name
JSC "ELECTRIC WIRE"
The purpose of the floor and the room itself
Concrete topping floor for warehouse in Podolsk
Type of floor
topping floors
Thickness of the concrete layer
170 cm
Room area
380 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION

The client turned to us with his technical task, i.e. he already had a design developed: the floor thickness of 170 mm and reinforcement in two layers of reinforcement with a diameter of 8 mm were prescribed.

Before pouring, the base was a layer of crushed stone with an asphalt coating. The customer said that they would dismantle the asphalt and take it out on their own, and they would provide us with a crushed stone base ready for the installation of a new floor.

Even at the negotiation stage, our employee contacted the client and offered more optimal options for filling with fiber. He replied that "we are conservative people, we have an understanding that reinforcement needs to be done with rebar, so please give us a solution according to our request."

Since customer orientation in our company is one of the key principles of work, we treated the customer's point of view with great understanding and provided an offer based on his request: coating thickness 170 mm; double reinforcement with a diameter of 8 mm. There was also a request to lay a warm floor around the perimeter and take into account the planned loads – a loader of 7 tons and bays of 3 tons, so these points were not ignored in the technical solution. We also note that it was necessary to make a coating on a small area in front of the gate.

We sent an offer, after that the customer himself dismantled and removed the old asphalt, and then invited us to shoot. At the facility, a survey was conducted on the differences, on the basis of which a schematic drawing was provided. On it, we showed in which places it is necessary to add crushed stone, and in which places it is necessary to remove it so that the thickness does not increase and remains 170 mm. With the help of this drawing, the client corrected the base, and we have already finalized the estimate. The proposed and implemented technical solution is a concrete floor with topping.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 21
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 731 700 ₽
Concrete topping floor for warehouse in Podolsk: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: JSC "ELECTRIC WIRE"

how we implemented this floor design

DIFFICULTIES DURING WORK

The customer eventually decided to make the underfloor heating himself. And here it was necessary to carry out everything in coordination – in the interval between the binding of the reinforcing mesh by us and the pouring of concrete by us, they had to just complete the stage of work related to the underfloor heating. Well-coordinated work eventually led to a common victory.

There was one difficulty when filling – there was only one entrance in the room. It was necessary to start with him, and they also had to finish. This to some extent limited the freedom of action of our workers, but thanks to a lot of experience and following standard technology, there were no problems at this stage.

OUR RESULTS

The customer was constantly with us at the facility, saw all the stages with his own eyes and how we coped with the difficulties that arose. As a result, he was very satisfied with the quality and timing of the work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Double reinforcement is ready
2.jpg
We accept and level the concrete mixture on the site in front of the gate
3.jpg
The concrete was leveled on the site in front of the gate
4.jpg
We accept the concrete mixture indoors
5.jpg
We process the floor with special equipment
6.jpg
The stage of processing by grout machines

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY JSC "ELECTRIC WIRE"

SEE THE RESULT OF OUR WORK
result-elektroprovod.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton