INDUSTRIAL FLOOR IN THE CITY OF VIDNOYE

WE HAVE SAVED FOR THE CLIENT 455 500

FLOOR ENGINEERING CONSTRUCTION Industrial floor for loading and unloading area in the city of Vidnoye

Moscow Region, Vidnoye city, Aparinki village
Characteristics and description
Company name
Vector LLC
The purpose of the floor and the room itself
Industrial floor for loading and unloading area in the city of Vidnoye
Type of floor
topping floors
Thickness of the concrete layer
120 cm
Room area
641.1 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

During the technical inspection of the object, we received the following data: the base is asphalt with a thickness of about 70-80 mm on good concrete slabs. When formulating the task, the customer called durability a key factor in the final coverage – the object is owned and there is a desire to use it for a long time. Also, when performing the work, it was necessary to take into account that there would be heavy traffic of various vehicles on this site.

Another requirement of the customer is that the work at this facility will be carried out in two stages, since this is an operating enterprise and it is not possible to stop the process. Accordingly, the process of installing the floor will look like this: first dismantle one half of the coating, pour, pause; then repeat the same steps for the other half. Another customer's wish is that the final coating should be with a smooth slope.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 228 000 ₽
Industrial floor for loading and unloading area in the city of Vidnoye: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Vector LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

Already during the work, it became clear that additional actions are required to dismantle the old asphalt foundation, associated with an increase in the volume of dismantling. Everything was quickly agreed with the customer, and this did not greatly affect the initial work plan and deadlines. The rest of the work was carried out as usual.

OUR RESULTS

The client was satisfied with the result of our work. Moreover, he said that they are expecting another large facility where reliable floors need to be poured, and we are being considered as a contractor for a new facility.

This loading and unloading platform is our second facility in the city of Vidnoye, where we have carried out work to create a high-quality industrial coating.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We dismantle the old base
2.jpg
Intermediate result of the process of dismantling the old coating
3.jpg
The trays were delivered in disassembled form
4.jpg
We are preparing a place for laying trays
5.jpg
We stack the trays
6.jpg
We have prepared a reinforcing mesh for laying
7.jpg
The trays are fully mounted
8.jpg
The reinforcement mesh was laid
9.jpg
Preparation for concrete supply
10.jpg
The whole concrete mixture was taken and leveled
11.jpg
We process the coating with grout machines
12.jpg
We process the site with grout machines

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Vector LLC

SEE THE RESULT OF OUR WORK
result-vektor.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton