FOUND OUT THE NEEDS OF THE CLIENT
In October 2020, we signed a contract to carry out work on the installation of floors. The object is a hangar consisting of two buildings, each of them at its own level. A whole set of tasks was required of us: to remove the foundation; to hollow out the old asphalt; to remove some ground level; to dig trenches under the foundation, pour sand, level and tamp; to put the formwork; to tie the frames for the foundation; and only then to fill the foundation, fill the base, tamp the base, tie the reinforcement and finally pour concrete.
The following aspects are important to the customer: