SPARK-PROOF INDUSTRIAL SELF-LEVELING FLOOR FOR GAS DISTRIBUTION STATION IN MOSCOW

WE HAVE SAVED FOR THE CLIENT 124 700
15%Economy
Spark-proof industrial self-leveling floor for gas distribution station in Moscow

FLOOR ENGINEERING CONSTRUCTION Spark-proof industrial self-leveling floor for gas distribution station in Moscow

Mezhdunarodnoe Highway, 4th Novoselki Street, Moscow
Characteristics and description
Company name
StroyMekhanizatsiya LLC
The purpose of the floor and the room itself
Spark-proof industrial self-leveling floor for gas distribution station in Moscow
Type of floor
floor screed
Thickness of the concrete layer
5 cm
Room area
130.32 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We make concrete floors with topping at most of our facilities. But this time the customer contacted us with a different task. It was necessary to carry out work for the gas distribution station.

A detailed survey of the client and an on–site inspection of the facility gave us all the necessary information to select the optimal technical solution - an intrinsically safe industrial self-leveling floor with an average thickness of 5 cm using the material "Reapol-20I".

Terms of work
Number of days for all work: 5
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 831 000 ₽
Spark-proof industrial self-leveling floor for gas distribution station in Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: StroyMekhanizatsiya LLC

how we implemented this floor design

WORK FEATURES

When using this technology, we encountered some difficulties, one of which was controlling the temperature of the water, material and rooms. Heat guns were used to warm up the object; water was brought from a column and poured into barrels located in the main room; material from the street was also brought inside to avoid cooling.

Another feature of the technology used here was the selection of the correct amount of water for preparing the solution. According to the manufacturer's instructions, 2-3 liters per 1 bag were allowed. At first, we decided to use 2.7-2.8 liters.

These numbers turned out to be too large. After talking with the technologists of the manufacturer of the mixture "Reapol-20I", we realized that the amount must be carefully selected on the spot.

Our ignorance led to the fact that in the first section of the fill there were delaminations. Such places had to be corrected by additional grinding. In the second and third fills, we, having already learned from experience, used less water, and everything went smoothly there.

OUR RESULTS

Although the work on this site was not without errors, we fixed everything and handed over the floor to the client in proper condition and the required quality. In the next few days, the boiler room equipment should be installed in the premises.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Sanding the base
2.jpg
Vacuuming
3.jpg
Priming the base with the first layer
4.jpg
The base has been primed with a second layer
5.jpg
Reapol-20 material is in place
6.jpg
Mixing the filling mixture
7.jpg
The screed is being poured
8.jpg
The grout of the first area has been completed
9.jpg
The small rooms and the rest of the main room have been primed
10.jpg
Guides have been installed; a damping tape has been fixed on the walls
11.jpg
Compaction and stretching of mortar with a vibrating screed
12.jpg
Operation of the grout machine
13.jpg
The filling in the small rooms has been completed
14.jpg
Completed grout and applied varnish in small rooms
15.jpg
The seams have been cut
16.jpg
Sealing of seams has been completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY StroyMekhanizatsiya LLC

SEE THE RESULT OF OUR WORK
result-strojmekhanizaciya-mezhdunarodnoe-shosse.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton