Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR FOR AN INDUSTRIAL BUILDING IN SHCHELKOVO

WE HAVE SAVED FOR THE CLIENT 2 126 200

FLOOR ENGINEERING CONSTRUCTION Topping floor and monolithic w/w overlap for production and warehouse complex

MO, Shchelkovo, Zavodskaya str., 2, room 310
Characteristics and description
Company name
Arsenal GROWTH CJSC
The purpose of the floor and the room itself
Topping floor and monolithic w/w overlap for production and warehouse complex
Type of floor
topping floors
Thickness of the concrete layer
200 cm
Room area
6244 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The customer and the general contractor have already been to our clients before, for whom we have implemented several projects on industrial floors.

In this case, the object was an industrial building consisting of a basement and two floors, with one floor structure at the bottom and another on the floors.

Initially, the client was going to fill the floors in the basement and the floors on the first and second floors. We proposed to perform not just the filling of the floors, but to do it immediately with a reinforced top layer. This technical solution was extremely advantageous both from the point of view of costs and from the point of view of the future load on the stove. As a result, this option was implemented.

In the basement, we also announced our decision, since there was already a flooded load-bearing plate there. It was proposed to pour not it, but a concrete screed with reinforcement made of polypropylene macrofibre. The customer agreed with us here, because this method, firstly, solved his problems, and, secondly, it also turned out to be economically profitable.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 10 631 100 ₽
Topping floor and monolithic w/w overlap for production and warehouse complex: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Arsenal GROWTH CJSC

how we implemented this floor design

FEATURES OF THE WORKS

Although the technology of the floor arrangement chosen by us turned out to be a more profitable option, the work was not without difficulties.

Floor slabs are more difficult to fill than floors, as there is more complex reinforcement, more complex nodes. In addition, there were deformation seams.

The overlap had to be filled with a non-removable formwork made of profiled sheet. When working in this way, there were nuances: cracks, deformations, etc. It was also necessary to take into account the moment that the concrete should not have damaged the formwork.

In the course of the work, we encountered the fact that the customer changed the reinforcement units. For example, we have already "sarmated" more than half of the area on the ground floor, after which adjustments were made. I had to do the reinforcement again.

OUR RESULTS

Thanks to the chosen technical solutions and their successful implementation, it turned out to achieve high efficiency from the floor designs. We gave the client high quality, technological efficiency and at the same time budget savings.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The basement is being prepared
2.jpg
The reinforcement of the floor slab of the 1st floor has begun
3.jpg
Preparation of concrete for pouring
4.jpg
Take the first concrete
5.jpg
Binding of the overlap frame
6.jpg
Grout begins with topping in the basement
7.jpg
Grout is being completed
8.jpg
Grout completed
9.jpg
The seams on the first card are cut
10.jpg
The filling continues
11.jpg
Working with topping
12.jpg
Completed work in the basement
13.jpg
Reinforcement on the 1st floor
14.jpg
Preparation for filling on the 1st floor
15.jpg
Filling stage
16.jpg
Grout is underway
17.jpg
Finished grout
18.jpg
The filling continues on another square
19.jpg
Floor treatment with grout machines
20.jpg
A moisture-retaining layer has been applied

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Arsenal GROWTH CJSC

SEE THE RESULT OF OUR WORK
result-arsenal-rost-2022.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton