WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer and the general contractor have already been to our clients before, for whom we have implemented several projects on industrial floors.
In this case, the object was an industrial building consisting of a basement and two floors, with one floor structure at the bottom and another on the floors.
Initially, the client was going to fill the floors in the basement and the floors on the first and second floors. We proposed to perform not just the filling of the floors, but to do it immediately with a reinforced top layer. This technical solution was extremely advantageous both from the point of view of costs and from the point of view of the future load on the stove. As a result, this option was implemented.
In the basement, we also announced our decision, since there was already a flooded load-bearing plate there. It was proposed to pour not it, but a concrete screed with reinforcement made of polypropylene macrofibre. The customer agreed with us here, because this method, firstly, solved his problems, and, secondly, it also turned out to be economically profitable.
The following aspects are important to the customer: