Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING INDUSTRIAL FLOOR FOR A LARGE WAREHOUSE NEAR MOSCOW

WE HAVE SAVED FOR THE CLIENT 5 439 000

FLOOR ENGINEERING CONSTRUCTION Topping floor for a large warehouse in Gubtsevo

MO, Pervomayskoye settlement, Gubtsevo village, Dorozhnaya str., 20, p. 1
Characteristics and description
Company name
NorkPalm LLC
The purpose of the floor and the room itself
Topping floor for a large warehouse in Gubtsevo
Type of floor
topping floors
Thickness of the concrete layer
180 cm
Room area
8766 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

In a large warehouse with an area of 8,766 m2, it was necessary to make strong floors that would withstand heavy loads. It is noteworthy that the foundation on the object was not ready at all. Moreover, the customer did not even have an idea about the construction of the floor and about the preparation of the foundation.

The foundation on the object was different everywhere: in one place the whole concrete; in another – broken concrete; in the third – crushed stone; in the fourth – tile. The height was also different: somewhere higher, somewhere lower.

Our chief designer went to the facility itself, thoroughly investigated it and found the best technical solution, which was subsequently offered to the customer and which was then implemented.

The chosen technology is preliminary dismantling and preparation of the base, after which the device of a topping floor with steel fiber.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 51
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 27 195 700 ₽
Topping floor for a large warehouse in Gubtsevo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: NorkPalm LLC

how we implemented this floor design

FEATURES OF THE WORKS

Before we prepared the foundation, the height differences reached 25 cm. We put our foreman at the facility, who controlled the progress of the work, and the equipment and materials were provided by the customer. Thus, the foundation was first fully prepared, and only then went directly to the filling of the floor.

Our company has its own concrete recipe developed jointly with fiber designers. Our chief designer went to the concrete assembly and arranged for the concrete to be made according to our recipe. Thanks to this and the use of two types of steel fiber (4d 55/60 in places with the highest load and 3d 55/60 in places with a lower load), we were able to make the floors clearly according to the client's requests and loads. By the way, the fiber was filled in immediately on the concrete node.

OUR RESULTS

A large storage room is now provided for many years with a reliable floor that will withstand even the heaviest loads.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The skating rink has arrived at the facility
2.jpg
Preparation of the foundation
3.jpg
Checking the concrete assembly
4.jpg
The stitches were brought
5.jpg
Preparation of the base in a place inaccessible to the skating rink
6.jpg
The first mixer is sent
7.jpg
Reception and leveling of concrete mix
8.jpg
Topping filling
9.jpg
Surface treatment with grout machines
10.jpg
Applied varnish
11.jpg
The shrinkage seams on the first map are cut
12.jpg
Works on the following map
13.jpg
Installation of non-removable formwork
14.jpg
Another area is ready for filling
15.jpg
Filling the next square
16.jpg
Took the eleventh mixer
17.jpg
A deformation seam was installed on the gate
18.jpg
Working with the fourth and fifth cards
19.jpg
Applying varnish on the fourth card
20.jpg
The seventh card is filled in
21.jpg
The customer has prepared the formwork for the landing stages
22.jpg
The filling of the eighth card is completed
23.jpg
The tenth card
24.jpg
Cut seams, outside view

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY NorkPalm LLC

SEE THE RESULT OF OUR WORK
result-nork_palm-gubtsevo.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton