WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
In a large warehouse with an area of 8,766 m2, it was necessary to make strong floors that would withstand heavy loads. It is noteworthy that the foundation on the object was not ready at all. Moreover, the customer did not even have an idea about the construction of the floor and about the preparation of the foundation.
The foundation on the object was different everywhere: in one place the whole concrete; in another – broken concrete; in the third – crushed stone; in the fourth – tile. The height was also different: somewhere higher, somewhere lower.
Our chief designer went to the facility itself, thoroughly investigated it and found the best technical solution, which was subsequently offered to the customer and which was then implemented.
The chosen technology is preliminary dismantling and preparation of the base, after which the device of a topping floor with steel fiber.
The following aspects are important to the customer: