Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR IN A WAREHOUSE IN SHATURA

WE HAVE SAVED FOR THE CLIENT 422 200
20%Economy
Topping floor for a warehouse in Shatura

FLOOR ENGINEERING CONSTRUCTION Topping floor for a warehouse in Shatura

MO, Shatura, Sovetskaya str., 1a
Characteristics and description
Company name
"ГазонСити Трейд" ЖШҚ
The purpose of the floor and the room itself
Topping floor for a warehouse in Shatura
Type of floor
topping floors
Thickness of the concrete layer
130 cm
Room area
1200 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION

The customer was active from the very beginning of our interaction – during telephone conversations he openly gave the required information. It was easy enough to work with him, discuss details, coordinate various points. When we offered our solutions, the client listened to them with interest, at the same time conveying his wishes to us.

What can be said about the object itself and the tasks set by the customer? Initially, this room was a workshop for the production of concrete blocks. The condition of the object, admittedly, was deplorable. The client wanted to make a warehouse for various seeds, fertilizers.

To do this, he turned to us for an industrial floor. As a technical solution, a standard option was chosen – a concrete floor, including fiber and a bp 5 road grid, with topping. The planned loads are electric cars weighing 4 tons and five–storey racks.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 111 200 ₽
Topping floor for a warehouse in Shatura: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: "ГазонСити Трейд" ЖШҚ

how we implemented this floor design

DIFFICULTIES DURING WORK

The base turned out to be very, very uneven. We came, took a picture – the customer knocked out where necessary, hollowed out. But even so, the base drops ranged from 7 cm to 20 cm.

And the problem was that the storm drain was leaking. There were large holes in the roof. Already during the pouring, and then the pouring, it began to rain well, and there was a lot of water on the concrete. To settle this situation, a car with a tower was driven into the room and the roof was redone right during the pouring. The water from the stove, of course, was then also cleaned and removed.

OUR RESULTS

In one shift we filled the entire area of 1,200 m2. Both the construction director and the customers themselves were present at the facility during the work. They saw the difficulties we had to face, and did not expect that we would be able to solve them so well. But standard technology, extensive experience and professional approach have done their job.

Well, the best confirmation of our labors from a satisfied client may be a new facility that needs help. And so it happened – we have already filled the floor in another room with an approximate same area, but we will tell you more about this on a separate page. Moreover, negotiations are already underway about work on the third facility.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Surface preparation for pouring
2.jpg
We prepare the concrete mixture for pouring
3.jpg
We accept a concrete mixture
4.jpg
Treated the floor with grout machines

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY "ГазонСити Трейд" ЖШҚ

SEE THE RESULT OF OUR WORK
result-shatura-2.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton