FOUND OUT THE NEEDS OF THE CLIENT
The client turned to us with the task of making a concrete floor with a hardener in two hangars, and both rooms are operational. Ie, it was required to fill in two stages: first, half in each of the hangars, then wait for time and thereby allow the flooded area to dry; then the hangar workers will have to move the goods from the untouched half of each from the premises to the flooded coating; finish the filling on the second halves.
The following aspects are important to the customer: