Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Good season"
how we implemented this floor design
DIFFICULTIES DURING WORK
In each of the hangars there were not very high racks, and they were not disassembled. Because of this, large two-rotor grout machines simply did not pass in height in those places. The problem was solved by the fact that the floor under the shelves was processed with small "helicopters", and somewhere manually.
The second difficulty is the cold weather. I had to fill the floor quickly so that the concrete pump would not freeze.
OUR RESULTS
Concrete floors were filled in two hangars on time, of proper quality and without any complaints from the customer. In one of the rooms, a green topping was made – in our opinion, it looks very aesthetically pleasing. You can see this for yourself by looking at the photos of the stages of work below on this page.
Thanks to the work in these hangars, we have added another region of our vast country, the Kaluga Region, to our geography of completed objects.