WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
The customer contacted us again, but this time with an object of a larger area. The room was divided into two parts. The main area was planned for a warehouse, and in it the floor was needed in the horizon. The second zone was allocated for a production room. There was a separate gate for her. The division of the whole room by the wall into two separate ones was planned to be done after we poured the floors. Therefore, we took this moment into account when calculating the consumption of concrete and when shooting.
The loads at the facility were assumed to be standard – racks, carts. We chose and implemented a technology – a concrete floor with a reinforcing top layer.
The following aspects are important to the customer: