WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The object, located in the center of Moscow, was an underground parking on the 1st floor. It was required to make a concrete screed under a polymer coating. Reinforcement with polypropylene fiber was agreed upon inside the room itself, but at the exit it was necessary to perform combined reinforcement – both fiber and reinforcement mesh.
The following aspects are important to the customer: