WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer at this facility was the general contractor. He did a lot of work himself, including dismantling, repairing floor slabs, and replacing windows. And he turned to us for the installation of floors for three floors.
The technical solution was identified as follows: a concrete floor with topping, reinforced with plastic macrofibre, as well as additional reinforcement with mesh in several places.