On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR THE WORKSHOP IN RAMENSKOYE DISTRICT

WE HAVE SAVED FOR THE CLIENT 157 333
20%Economy
Floor for the workshop of LLC "Turbo-coupling", MO

FLOOR ENGINEERING CONSTRUCTION Floor for the workshop of LLC "Turbo-coupling", MO

MO, Ramenskiy district, Vereyskoye village, Vereya village, Ostrovetsky sh., 18
Characteristics and description
Company name
Turbo Coupling LLC
The purpose of the floor and the room itself
Floor for the workshop of LLC "Turbo-coupling", MO
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
460.9 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

HAVE YOU CHOSEN A SUITABLE TECHNOLOGY

Since this object is a production room where the coating must have strength, we chose the best option – a concrete floor with a reinforcing top layer.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 10
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 787 000 ₽
Floor for the workshop of LLC "Turbo-coupling", MO: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Turbo Coupling LLC

how we implemented this floor design

THE RESULTS OF OUR WORK

All stages were completed on time. The client received a high-quality concrete floor with topping, as well as savings of 157,333 rubles.

See below the photos of the stages of our work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The object before the start of work
2.jpg
Preparation of the foundation for work
3.jpg
Installing a vapor barrier
4.jpg
Cutting of shrinkage seams

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Turbo Coupling LLC

SEE THE RESULT OF OUR WORK
result-turbomufta.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton